Once the concrete mixture looks good in the laboratory, it's time to conduct
full scale testing. The closer these tests are to actual production
conditions, the more valuable they will be. Adjust your proportions as
necessary to accommodate going from the laboratory to the field.
Don't forget to work with the contractor at this time -- pumping and
finishing tests may be appropriate.
The Silica Fume Association
38860 Sierra Lane, Lovettsville, VA 20180
Tel: 540.257.4224 Fax: 540.822.9456